BÜYÜKÇEKMECE, İSTANBUL | 2026 | 5 photos
60 kW solar energy system · Rooftop panel installation with ballasted mounting · Energy storage with 2 hybrid inverters and 8 battery modules · DC/AC protection, breaker and surge arrester installation · EV charging station connection · Testing and commissioning
ALTIEYLÜL, BALIKESİR | 2025 – 2026 (1 year) | 13 photos
Infrastructure installation works · Construction stage — low-current and power systems · Testing and commissioning — low-current and power systems · Execution of provisional acceptance and handover processes
ARNAVUTKÖY, İSTANBUL | 5 photos
Factory power, low-current, lighting and electrification works · Installation of LV distribution and compensation panels
ALTIEYLÜL, BALIKESİR | 2018 (6 months) | 4 photos
Administrative building power, low-current, lighting and electrification works · Installation of LV distribution, compensation and sub-distribution panels
GEBZE, KOCAELİ | 3 photos
Administrative building power, low-current, lighting and electrification works · LV distribution, compensation and sub-distribution panels
ŞİŞLİ, İSTANBUL | 4 photos
Field End Element Assembly (TRA, Loss Antenna, TRA Filter, Norming Point) · Signaling Panel Assemblies (DCC/BEC, OBC, DTS, DTS Station, OTC, ATC, WMPP etc.)
GEBZE, KOCAELİ | 3 photos
Power, low-current, lighting and electrification works for the logistics areas and administrative building
GEBZE, KOCAELİ | 5 photos
Main distribution panels, meter panels, sub-distribution panels, busbar line — all power electrification works
SİLİVRİ, İSTANBUL | 2 photos
1000 kVA transformer substation installation · Factory power, low-current, lighting and electrification works
ARNAVUTKÖY, İSTANBUL | 2 photos
2500 kVA HV switchgear assembly and installation · Factory power, low-current, lighting and electrification works