Ground-mounted solar and solar farm projects
Unlicensed generation plants. We handle the whole process, from application to commissioning.
We handle the permits
With ground-mounted plants, the hard part is not the installation but the application and permit process. We handle every step, including the application, design approval and correspondence with the distribution company. The client doesn't need to deal with a separate consultant.
Scale
Land projects typically start at 500 kWp and go up to the MW scale. The slope and orientation of the land and its distance to the distribution line directly affect the project; we assess these together during the site survey.
Process
- Land survey — slope, orientation, ground conditions and distance to the line
- Feasibility — production estimate and investment calculation
- Unlicensed generation application
- Design approval and distribution company procedures
- Mounting structure and panel installation
- Transformer, medium-voltage cell and switchgear work
- Testing, acceptance and commissioning
- Periodic maintenance after commissioning
The medium-voltage side
In ground-mounted plants, the transformer substation, medium-voltage cells and switchgear work are the critical part of the project. This is our core expertise; we have been doing the same work on factory contracting projects for years.
Is your land suitable?
Share the location and size, and we'll prepare a feasibility study