
Case Study , Factory , Electrical Contracting
Project Summary: Electrical works for three blocks at Nestlé's dry pet food factory
Before the production line was commissioned, the electrical infrastructure of blocks C1, C2 and C3 was completed, and the building management system field terminations were connected and tested.



